title: "Analytics and reporting"
description: "The Overview, Materials, Material waste and Utilization reports: throughput, cost, success rate, peak hours and machine utilization with OEE for your fleet."
url: https://pluraprint.com/docs/administration/analytics
---
# Analytics and reporting

The Overview, Materials, Material waste and Utilization reports: throughput, cost, success rate, peak hours and machine utilization with OEE for your fleet.

Choose a report on the **Analytics** page, then set its date range and filters. The report scopes are **Overview**, **Materials**, **Material waste**, and **Utilization**. All require the `analytics.view` permission.

**Export** downloads the displayed report as CSV or JSON, including its scope, date range, and filter IDs. Overview exports contain a `section` column for each breakdown. Utilization exports contain fleet totals and printer rows. Exports use the loaded results. Use **Refresh** to fetch changes made since loading.

When you supply both dates, choose at most 367 days, which fits a full year including both end dates. You can select up to 100 users, printers, or material types per filter. Retained-job reports examine up to 20,000 matching jobs and show up to 1,000 groups, such as printers or projects. Omitting dates still requests retained history. It doesn’t select a shorter default period. If the request exceeds a limit, narrow its dates or filters and refresh. Reports fail explicitly instead of showing partial totals. Unusually long names or project labels (over 1,024 UTF-8 bytes) must be shortened or excluded.

If reporting is busy, wait for another report to finish and retry. A report that exceeds its query deadline also asks you to narrow the request. Neither response means there were no matching jobs. Reports keep using manual refresh.

## Overview and materials

**Overview** opens with the period’s totals: jobs submitted, completed (with the share of finished prints that succeeded), failed, average print time and estimated material cost. Below them are jobs over time, breakdowns by user and printer, peak submission hours, and estimated material cost over time. Charts by day show every day in the range, including days with no jobs, using UTC days. The project/cost-center breakdown appears when Department and cost center job-submission fields are enabled in General settings.

**Materials** shows planned grams by material variant, type, and color. These amounts are recorded when printing starts. They aren’t measurements of actual consumption. Estimated costs use those amounts and current material prices. Type charts use distinct category colors. Variant and color charts use the material’s catalog color, with outlined swatches to keep light and dark materials visible in both themes. Materials without a catalog color use a neutral marker.

Both reports select jobs by their submission date. Filter by user, printer, material type, or status. User and printer selectors appear only when you have permission to view those lists. Changing scopes preserves your selections; only filters relevant to the current scope apply.

## Retained manufacturing facts

Overview also shows **Retained manufacturing facts**, an independent record of dispatch attempts observed since this upgrade. These facts survive job, file, printer and user deletion. Earlier jobs aren’t backfilled because their retained history cannot reliably identify every physical attempt.

Each dispatch claim counts as one attempt, including a retry later refused before the command is sent. **Unknown** includes handoffs awaiting positive evidence; it must not be treated as failure. **Did not start** requires definite evidence. **Started** counts confirmed starts; **Completed** and **Failed** record confirmed outcomes. Each physical retry or reprint has a separate attempt identity.

Only this panel’s selected dates apply. Its UTC daily totals ignore personal, printer, status and material filters used by the retained-job reports. Select at most 366 days and use **Refresh facts** for a new snapshot. The panel shows when it was generated and exports its displayed daily totals as CSV.

Estimated grams and millilitres come from the planned quantities resolved at start. Measured quantities are separate and require an explicit evidence-based correction. Missing material estimates remain visible. Confirmed duration runs from first observed start to operator outcome confirmation, including operator delay. It is not a measured machine cycle time.

Manufacturing facts have no automatic expiry under the reporting retention policy. They contain no person, job, design, printer connection or credential fields. Corrections require settings-update authority, retain the original observations and create an audit entry. Existing material-waste and utilization reports below continue to use retained job history and their documented approximations.

## Material waste

Select **Material waste**, choose your semester or other date window, and optionally filter by material type, printer, or user. The report estimates waste for each material using:

> Estimated waste in grams = planned material grams × recorded progress ÷ 100

For example, a 200 g PLA print recorded at 10% contributes an estimated 20 g. Only jobs with a recorded print start that were subsequently marked **failed** or **cancelled** qualify. Jobs that failed during processing or were cancelled before starting are excluded. This scope always includes both failure and cancellation, so it has no status filter.

The window applies to the latest matching failure or cancellation event, not the upload date. Each retained job contributes once, using its last recorded progress and material amounts. A bar chart compares estimated waste by material type, showing the ten largest estimates when there are more than ten types. The table and export break down failed and cancelled jobs by material type. A multi-material job can appear under more than one type.

This is an estimate. It assumes material use is proportional to progress, including for multi-material jobs. Recorded 0% contributes 0 g; missing progress telemetry can therefore undercount waste. Jobs without usable material amounts are reported separately. Supports and purge from successful prints aren’t included.

Material-waste reports use retained job history. Older same-job physical restarts can overwrite the previous run’s progress and material amounts, so those earlier runs cannot be reconstructed. Current reprint commands create separate jobs. Deleted jobs are absent. The report excludes cancellations or dispatch failures after a recorded requeue when no new start was recorded.

## Machine utilization & OEE

The **Utilization** chart compares utilization and OEE by printer. Fleet totals and quality are included in the export. Only date and printer filters apply.

- **Utilization**: the share of a printer’s available time that it spent actively printing:

  > Utilization % = printing time ÷ available time

  Printing time is measured from each job’s _print started_ event to the point the print finished (completed, failed, or cancelled). Available time is the wall-clock time the printer existed within the selected window. A powered-on but idle printer shows 0% utilization rather than dropping out of the report.
- **Quality**: the success rate of finished prints:

  > Quality % = completed ÷ (completed + failed)
- **OEE (Overall Equipment Effectiveness)**: a single headline score combining the two:

  > OEE % = Utilization × Quality

  The classic OEE formula also includes a _Performance_ factor (speed loss versus an ideal cycle time). Pluraprint does not store a per-job ideal cycle-time standard, so Performance is treated as 100% and OEE reflects utilization and quality only. This is stated here so the number is never mistaken for a speed-loss-adjusted figure.

Utilization and OEE are reconstructed from each job’s recorded print lifecycle events, so they populate from your existing print history immediately: no extra configuration is required.